CDOT Repair Shop
Location
Chicago, IL
Square Footage
16,000 S.F.
Scope of Work
General Contractor: Paul Borg Construction Company
The project involved the expert installation of a 16,000 S.F. high-performance roofing system. A 60-mil TPO Fleeceback fully adhered system was utilized to provide superior durability, enhanced puncture resistance, and energy efficiency. The integrated fleece backing ensured an exceptionally strong bond and added structural cushioning, delivering a seamless, long-term protective solution tailored to the specific demands of the build.
CDOT Repair Shop — Chicago, IL

